2 MWp Canopy-Mounted

JEREZ SOUTH AREA

Operation and maintenance of a 2 MWp installation integrated into parking canopies, transforming existing infrastructure into an energy asset.

  • 2,055 kWp
  • 11,976 panels
  • 2,531 MWh annual production
  • Photovoltaic integration in canopies
  • Coordination with continuously transited site
  • Fault control and management with minimal response time
  • More than 2.5 GWh generated annually
  • 440 tons of CO₂ avoided
  • Efficient utilization of available space

Other projects

FRAGADÍS FRED

Self-consumption for High-Demand Industry

More information
LA LUZ 260 MWp

261 MWp under O&M contract

More information
RCD ESPANYOL

Solar energy in operational stage

More information