First 2 MWh hybrid storage system

CÁCERES 2020

Integration of a 2 MWh BESS hybridized with a photovoltaic plant, aimed at improving energy management and the asset’s operational flexibility.

  • Total capacity: 2 MWh
  • Modular architecture
  • Estimated service life: up to 7,000 cycles
  • Hybridization of an asset in operation
  • Technical integration in a utility-scale environment
  • Innovation to maximize efficiency
  • Greater energy management capacity
  • Improved operational stability of the asset

Other projects

INQUIBA

Industrial solar plant in operation

More information
LA LUZ 260 MWp

261 MWp under O&M contract

More information
RCD ESPANYOL

Solar energy in operational stage

More information