Alterna Energía maintenance of four plants in the Barcelona metropolitan area
Blog

Alterna Energía Awarded Contract for Construction and Maintenance of Four Plants in the Barcelona Metropolitan Area

Alterna energia

October 15, 2021
A total of 515 MWh will be generated annually across the plants in Santa Coloma de Cervelló, Sant Cugat del Vallès, Gavà, and Sant Adrià del Besòs.
The four projects will generate a total power of 375 kW.

Alterna Energía, a company dedicated to developing comprehensive photovoltaic and self-consumption installation solutions, has been awarded the public contract for the construction and maintenance, for one year, of four plants in the Barcelona Metropolitan Area (AMB), following a competitive process in which more than ten companies from the sector participated. Specifically, the four projects are located in Santa Coloma de Cervelló, Sant Cugat del Vallès, Gavà, and Sant Adrià del Besòs.

The four plants will generate a total power of 375 kWp distributed among the Escola Güell in Santa Coloma de Cervelló (100 kWp), the Escola Municipal de Música Victòria dels Àngels in Sant Cugat del Vallès (100 kWp), the Centre de Suport a l’Empresa building in Gavà (75 kWp), and finally, the Poliesportiu Municipal CEM Besòs in Sant Adrià del Besòs (100 kWp). Furthermore, with their commissioning, the Barcelona Metropolitan Area will generate 515 MWh of energy.

These four new installations are part of the Framework Program for Energy and Climate Actions (PMEC) of the AMB , specifically the 100% Renewable Municipalities 2030 initiative, which aims to achieve carbon neutrality in municipal energy consumption (buildings and public lighting) before 2030, by installing 100 MWp of new photovoltaic capacity and reducing energy consumption by 50%.

Esther Morlanes, Director of Alterna Energía, states that “we appreciate the opportunity to work again for the Barcelona Metropolitan Area in the construction and maintenance of photovoltaic plants in renowned localities of the Area, helping communities adapt to a new way of producing energy and thereby mitigating environmental impact.”

Currently, Alterna Energía maintains a total of 125 MW in Spain, of which 10 MW are located in Catalonia.

Alterna Energía is a company dedicated to developing comprehensive photovoltaic and self-consumption installation solutions for businesses and institutions

With over 15 years of experience in the sector, they position themselves as the trusted partner for companies to reduce their energy costs and environmental impact while maximizing their investment returns. The company operates a control center at its facilities in El Prat de Llobregat, from where they monitor all their clients’ installations, thus offering a first-class service.

Alterna Energía stands out for its commitment to clients and the quality of its services, with a comprehensive service offering covering everything from engineering design to construction, commissioning, maintenance, and permit and legalization management.

Share:

Other news you may be interested in...

7 de October de 2021

Alterna Energía Quadruples Its International Business and Invoices Over 1 Million Euros from Its Plants Located in Latin America

2 de December de 2021

Alterna Energía, together with Iberdrola Smart Solar, is taking part in the construction of a photovoltaic installation for the renowned Bodegas Las Copas.

6 de July de 2021

Alterna Energía builds a photovoltaic installation for Perseida Belleza