<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Alterna Energía</title>
	<atom:link href="https://www.alternaenergia.com/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.alternaenergia.com/en/</link>
	<description>Es un referente en el sector fotovoltaico por su experiencia en la construcción y mantenimiento de plantas fotovoltaicas.</description>
	<lastBuildDate>Tue, 31 Mar 2026 10:07:51 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.alternaenergia.com/wp-content/uploads/2026/04/favicon-150x150.png</url>
	<title>Alterna Energía</title>
	<link>https://www.alternaenergia.com/en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Alterna Energía builds two photovoltaic plants that will generate more than 8 GWh of energy</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-builds-two-photovoltaic-plants-that-will-generate-more-than-8-gwh-of-energy/</link>
					<comments>https://www.alternaenergia.com/en/news/alterna-energia-builds-two-photovoltaic-plants-that-will-generate-more-than-8-gwh-of-energy/#respond</comments>
		
		<dc:creator><![CDATA[Comunicació Integral Neorg]]></dc:creator>
		<pubDate>Tue, 31 Mar 2026 10:07:51 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-builds-two-photovoltaic-plants-that-will-generate-more-than-8-gwh-of-energy/</guid>

					<description><![CDATA[<p>The project has been carried out for the Ingenostrum Group and reinforces the company&#8217;s commitment to the energy transition and the generation of clean energy in the country. Polacra Solar 2 and Polacra Solar 4 are located in Castile-La Mancha and will help save approximately 3,500 tons of CO2 per year. April 16, 2025.- Alterna<a class="more-link" href="https://www.alternaenergia.com/en/news/alterna-energia-builds-two-photovoltaic-plants-that-will-generate-more-than-8-gwh-of-energy/">Continue reading <span class="screen-reader-text">"Alterna Energía builds two photovoltaic plants that will generate more than 8 GWh of energy"</span></a></p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-builds-two-photovoltaic-plants-that-will-generate-more-than-8-gwh-of-energy/">Alterna Energía builds two photovoltaic plants that will generate more than 8 GWh of energy</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="ctextoapartado triggerload">
<div class="cfixwords">
<div class="">
<p><strong>The project has been carried out for the Ingenostrum Group and reinforces the company&#8217;s commitment to the energy transition and the generation of clean energy in the country.</strong></p>
<p><strong>Polacra Solar 2 and Polacra Solar 4 are located in Castile-La Mancha and will help save approximately 3,500 tons of CO2 per year.</strong></p>
<p><strong>April 16, 2025.- Alterna Energía</strong>, a company specializing in the development of comprehensive solutions for photovoltaic installations, has carried out the installation of two photovoltaic plants for the Ingenostrum Group: Polacra Solar 2 and Polacra Solar 4. These new facilities reinforce Alterna Energía&#8217;s commitment to the energy transition and the generation of clean energy in Spain.</p>
<p>Located in Castile-La Mancha, specifically in Manzanares and Santa Cruz de Mudela, the plants represent a significant step toward sustainability:</p>
<p>Polacra Solar 2 has a peak power of <strong>1,303.82 kWdc</strong> and a generation capacity of approximately <strong>2.55 GWh/year</strong>, allowing for a savings of <strong>1,100 tons of CO2 per year</strong>, equivalent to the energy consumption of more than <strong>500 homes</strong>. On the other hand, Polacra Solar 4, with a power of <strong>3,347.12 kWdc</strong> and a fixed structure, has an estimated production of <strong>5.5 GWh/year</strong>, which translates into a reduction of <strong>2,400 tons of CO2 per year</strong>, equivalent to the consumption of approximately <strong>1,100 homes</strong>. Both facilities inject the generated energy directly into the distribution grid, contributing to the supply of clean and sustainable energy for Castile-La Mancha.</p>
<p>Alterna Energía, a company traditionally specialized in photovoltaic self-consumption solutions, continues to expand its portfolio of projects for grid generation. In 2024 alone, Alterna has built more than 15 MW in ground-mounted projects.</p>
<p><strong>Esther Morlanes, Director of Alterna Energía</strong>, explains that <em>“at Alterna Energía, we continue to demonstrate our ability to lead self-consumption and generation projects throughout the peninsula. We are consolidating our position as a leader in sustainable and efficient solutions that drive the transition toward a cleaner energy model.”</em></p>
<p><strong><em>About Alterna Energía </em></strong><br />
<em>Alterna Energía is a company dedicated to the development of comprehensive solutions for photovoltaic and self-consumption installations for companies and institutions. With more than 19 years of experience in the sector, they present themselves as the trusted partner for companies to reduce their energy costs and environmental impact while making their investment profitable. The company has a control center at its facilities in El Prat de Llobregat from where they monitor all their clients&#8217; installations, thus offering a first-class service. </em></p>
<p><em>Alterna Energía stands out for its commitment to the client and for the quality of its services, with a comprehensive service offering covering everything from engineering design to construction, commissioning, maintenance, and the management of permits and legalization. </em></p>
</div>
</div>
</div>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-builds-two-photovoltaic-plants-that-will-generate-more-than-8-gwh-of-energy/">Alterna Energía builds two photovoltaic plants that will generate more than 8 GWh of energy</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.alternaenergia.com/en/news/alterna-energia-builds-two-photovoltaic-plants-that-will-generate-more-than-8-gwh-of-energy/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Alterna Energía closes 2024 with revenues exceeding €20M despite the self-consumption crisis in Spain</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-closes-2024-with-revenues-exceeding-e20m-despite-the-self-consumption-crisis-in-spain/</link>
					<comments>https://www.alternaenergia.com/en/news/alterna-energia-closes-2024-with-revenues-exceeding-e20m-despite-the-self-consumption-crisis-in-spain/#respond</comments>
		
		<dc:creator><![CDATA[Comunicació Integral Neorg]]></dc:creator>
		<pubDate>Mon, 30 Mar 2026 14:07:51 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-closes-2024-with-revenues-exceeding-e20m-despite-the-self-consumption-crisis-in-spain/</guid>

					<description><![CDATA[<p>The company has worked on over 47 projects, consolidating its market position despite the challenging sector context. The maintenance business unit has experienced the most growth, now representing 25% of the total activity. February 11, 2025 – Alterna Energía, a company specializing in the development of comprehensive self-consumption photovoltaic solutions for businesses, closed 2024 with<a class="more-link" href="https://www.alternaenergia.com/en/news/alterna-energia-closes-2024-with-revenues-exceeding-e20m-despite-the-self-consumption-crisis-in-spain/">Continue reading <span class="screen-reader-text">"Alterna Energía closes 2024 with revenues exceeding €20M despite the self-consumption crisis in Spain"</span></a></p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-closes-2024-with-revenues-exceeding-e20m-despite-the-self-consumption-crisis-in-spain/">Alterna Energía closes 2024 with revenues exceeding €20M despite the self-consumption crisis in Spain</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="ctextoapartado triggerload">
<div class="cfixwords">
<div class="">
<p><strong>The company has worked on over 47 projects, consolidating its market position despite the challenging sector context.</strong></p>
<p><strong>The maintenance business unit has experienced the most growth, now representing 25% of the total activity.</strong></p>
<p><strong>February 11, 2025</strong> – <strong>Alterna Energía</strong>, a company specializing in the development of comprehensive self-consumption photovoltaic solutions for businesses, closed 2024 with a turnover of €20 million and a total of 22 MW executed. Despite the challenging sector context, the company has worked on over 47 projects, consolidating its market position.</p>
<p>The Operations and Maintenance (O&amp;M) business unit has experienced the most significant growth, now representing 25% of the company&#8217;s total activity. In 2024, Alterna Energía managed a maintenance portfolio of 800 MW, providing specialized technical services to over 100 clients across Spain.</p>
<p>Furthermore, the company faces 2025 with a portfolio of over €20 million in self-consumption and grid-connected photovoltaic EPC projects, reinforcing the company&#8217;s growth expectations.</p>
<p><strong>Esther Morlanes, Director of Alterna Energía</strong>, states that <em>&#8220;we are very satisfied to have achieved these results despite the market situation. The prospects for 2025 are very positive, and we are confident in continuing to grow and add value to our clients&#8221;</em>.<strong> </strong></p>
<p>In line with its growth strategy, Alterna Energía has strengthened its international presence by undertaking two projects in Italy, solidifying its expansion outside of Spain. Additionally, the company has developed various battery projects, a key segment in its strategy to drive the energy transition and optimize energy storage.</p>
<p><strong><em>About Alterna Energía</em></strong></p>
<p><em>Alterna Energía is a company dedicated to developing comprehensive photovoltaic and self-consumption solutions for businesses and institutions. With over 19 years of experience in the sector, they present themselves as the trusted partner for companies to reduce their energy costs and environmental impact while making their investment profitable. The company has a control center at its facilities in Barcelona, from where they monitor all their clients&#8217; installations, thus offering a first-class service. </em></p>
<p><em>Alterna Energía stands out for its commitment to the client and the quality of its services, with a comprehensive service offering, covering everything from engineering design to construction, commissioning, maintenance, and permit and legalization management. </em></p>
</div>
</div>
</div>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-closes-2024-with-revenues-exceeding-e20m-despite-the-self-consumption-crisis-in-spain/">Alterna Energía closes 2024 with revenues exceeding €20M despite the self-consumption crisis in Spain</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.alternaenergia.com/en/news/alterna-energia-closes-2024-with-revenues-exceeding-e20m-despite-the-self-consumption-crisis-in-spain/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Alterna Energía boosts its energy storage division with 2 new BESS projects in Extremadura</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura/</link>
					<comments>https://www.alternaenergia.com/en/news/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura/#respond</comments>
		
		<dc:creator><![CDATA[Comunicació Integral Neorg]]></dc:creator>
		<pubDate>Sat, 28 Mar 2026 12:16:09 +0000</pubDate>
				<category><![CDATA[Uncategorized]]></category>
		<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura/</guid>

					<description><![CDATA[<p>The projects total 35 MW of power and 70 MWh of capacity and will be carried out in Badajoz and Cáceres. The company leads the projects as a full-service integrator, covering the design, engineering, assembly, supply, installation, commissioning, and final testing of each system. October 9, 2025.- Alterna Energía, a company specializing in the development<a class="more-link" href="https://www.alternaenergia.com/en/news/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura/">Continue reading <span class="screen-reader-text">"Alterna Energía boosts its energy storage division with 2 new BESS projects in Extremadura"</span></a></p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura/">Alterna Energía boosts its energy storage division with 2 new BESS projects in Extremadura</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="ctextoapartado triggerload">
<div class="cfixwords">
<div class="">
<p><strong>The projects total 35 MW of power and 70 MWh of capacity and will be carried out in Badajoz and Cáceres.</strong></p>
<p><strong>The company leads the projects as a full-service integrator, covering the design, engineering, assembly, supply, installation, commissioning, and final testing of each system.</strong></p>
<p><strong>October 9, 2025</strong>.- <strong>Alterna Energía</strong>, a company specializing in the development and maintenance of solar installations and energy storage solutions, strengthens its energy storage division with the <strong>award of 2 new BESS (Battery Energy Storage Systems) projects</strong> in Extremadura, specifically in Badajoz and Cáceres.</p>
<p>In total, the 2 battery storage projects will have an installed capacity of <strong>35 MW</strong> and a storage capacity of <strong>70 MWh</strong>, and their execution will be carried out progressively between 2025 and 2026, depending on the readiness of each site. The company will lead the project as a full-service integrator, covering the design, engineering, assembly, supply, installation, commissioning, and final testing of each system.</p>
<p>The execution of these projects consolidates Alterna Energía as one of the main EPC integrators in the BESS sector nationwide, expanding its territorial presence and its technological portfolio.</p>
<p><strong>An in-house technical team and state-of-the-art technology</strong></p>
<p>Alterna Energía directly handles key project phases, such as engineering, partial assembly, and on-site technical supervision, thanks to its highly qualified in-house technical team. Furthermore, these new projects will incorporate state-of-the-art technology, including high-performance LFP batteries in outdoor containers, bidirectional PCS systems with <em>grid forming</em> and <em>blackstart</em> capabilities, EMS systems with AI-driven optimization, native integration with PPC, <em>trader</em> functionalities for operation in electricity markets, as well as auxiliary systems, MVS, and medium voltage protections.</p>
<p>This is not the first project of its kind for the company, which already has two BESS plants in operation. This new award represents a significant expansion of its project portfolio, reinforcing its technological specialization and experience in the sector. Alterna Energía thus consolidates its position as a strategic player in the deployment of BESS solutions and strengthens its territorial presence.</p>
<p>The company&#8217;s approach is also distinguished by its ability to directly undertake Operation and Maintenance (O&amp;M) services, its approval as an official technical service by the battery manufacturer, and its technical solvency to execute complex projects with multiple technologies and high regulatory requirements.</p>
<p><strong><em>About Alterna Energía</em></strong></p>
<p><em>Alterna Energía is a company dedicated to developing comprehensive solutions for photovoltaic and self-consumption installations for businesses and institutions. With 19 years of experience in the sector, they position themselves as a trusted partner for companies to reduce their energy costs and environmental impact while making their investment profitable. The company has a control center at its facilities in Barcelona from which it monitors all its clients&#8217; installations, thus offering a first-class service. </em></p>
<p><em>Alterna Energía stands out for its commitment to the client and the quality of its services, offering a comprehensive service package, covering everything from engineering design to construction, commissioning, maintenance, and permit and legalization management. </em></p>
</div>
</div>
</div>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura/">Alterna Energía boosts its energy storage division with 2 new BESS projects in Extremadura</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.alternaenergia.com/en/news/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Alterna Energía and Frimercat Group complete their fourth photovoltaic project</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-and-frimercat-group-complete-their-fourth-photovoltaic-project/</link>
		
		<dc:creator><![CDATA[alterna]]></dc:creator>
		<pubDate>Wed, 26 Jul 2023 07:42:04 +0000</pubDate>
				<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-and-frimercat-group-complete-their-fourth-photovoltaic-project/</guid>

					<description><![CDATA[<p>In total, 4 photovoltaic projects have been developed: Frimercat 1 (2019), Frimercat 4 and Interfrisa (2022), and MercaEurofrio (2023). The projects, located in the Barcelonès region, have a total capacity of 1750 Wp, which will generate approximately 2,016 MWh per year. Only the first three installations have saved nearly 1,200 tons of CO2 emissions in<a class="more-link" href="https://www.alternaenergia.com/en/news/alterna-energia-and-frimercat-group-complete-their-fourth-photovoltaic-project/">Continue reading <span class="screen-reader-text">"Alterna Energía and Frimercat Group complete their fourth photovoltaic project"</span></a></p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-and-frimercat-group-complete-their-fourth-photovoltaic-project/">Alterna Energía and Frimercat Group complete their fourth photovoltaic project</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>In total, 4 photovoltaic projects have been developed: Frimercat 1 (2019), Frimercat 4 and Interfrisa (2022), and MercaEurofrio (2023).</p>
<p>The projects, located in the Barcelonès region, have a total capacity of 1750 Wp, which will generate approximately 2,016 MWh per year.</p>
<p>Only the first three installations have saved nearly 1,200 tons of CO2 emissions in recent years.</p>
<p>&nbsp;</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-and-frimercat-group-complete-their-fourth-photovoltaic-project/">Alterna Energía and Frimercat Group complete their fourth photovoltaic project</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Alterna Energía Builds Photovoltaic Installation for Vítaly (Preving Group)</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-builds-photovoltaic-installation-for-vitaly-preving-group/</link>
		
		<dc:creator><![CDATA[alterna]]></dc:creator>
		<pubDate>Thu, 13 Apr 2023 10:43:09 +0000</pubDate>
				<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-builds-photovoltaic-installation-for-vitaly-preving-group/</guid>

					<description><![CDATA[<p>The project is located on the roof of the company&#8217;s headquarters in Badajoz and has a peak power of 383.94 kWp. This installation will generate 572 MWh of energy per year and will save 227 tons of CO2 emissions. &#160;</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-builds-photovoltaic-installation-for-vitaly-preving-group/">Alterna Energía Builds Photovoltaic Installation for Vítaly (Preving Group)</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The project is located on the roof of the company&#8217;s headquarters in Badajoz and has a peak power of 383.94 kWp.</p>
<p>This installation will generate 572 MWh of energy per year and will save 227 tons of CO2 emissions.</p>
<p>&nbsp;</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-builds-photovoltaic-installation-for-vitaly-preving-group/">Alterna Energía Builds Photovoltaic Installation for Vítaly (Preving Group)</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Alterna Energía Carries Out Two Photovoltaic Projects for Ferrocentro and Galvanissa in El Salvador</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-carries-out-two-photovoltaic-projects-for-ferrocentro-and-galvanissa-in-el-salvador/</link>
		
		<dc:creator><![CDATA[alterna]]></dc:creator>
		<pubDate>Tue, 08 Nov 2022 08:47:36 +0000</pubDate>
				<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-carries-out-two-photovoltaic-projects-for-ferrocentro-and-galvanissa-in-el-salvador/</guid>

					<description><![CDATA[<p>The installations of the two photovoltaic projects will enable the reduction of CO2 emissions by more than 292,630 tons annually. The two new plants, located in San Salvador and San Juan Opico, have a combined capacity of 1,426.8 kWp. &#160;</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-carries-out-two-photovoltaic-projects-for-ferrocentro-and-galvanissa-in-el-salvador/">Alterna Energía Carries Out Two Photovoltaic Projects for Ferrocentro and Galvanissa in El Salvador</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The installations of the two photovoltaic projects will enable the reduction of CO2 emissions by more than 292,630 tons annually.</p>
<p>The two new plants, located in San Salvador and San Juan Opico, have a combined capacity of 1,426.8 kWp.</p>
<p>&nbsp;</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-carries-out-two-photovoltaic-projects-for-ferrocentro-and-galvanissa-in-el-salvador/">Alterna Energía Carries Out Two Photovoltaic Projects for Ferrocentro and Galvanissa in El Salvador</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Alterna Energía, Experts in Self-Consumption</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-experts-in-self-consumption/</link>
		
		<dc:creator><![CDATA[alterna]]></dc:creator>
		<pubDate>Thu, 07 Jul 2022 12:59:29 +0000</pubDate>
				<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-experts-in-self-consumption/</guid>

					<description><![CDATA[<p>At Alterna, we want to share one of our most recent projects with all of you. We are very proud to work alongside major companies to achieve the energy transition.</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-experts-in-self-consumption/">Alterna Energía, Experts in Self-Consumption</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>At Alterna, we want to share one of our most recent projects with all of you.</p>
<p>We are very proud to work alongside major companies to achieve the energy transition.</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-experts-in-self-consumption/">Alterna Energía, Experts in Self-Consumption</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Alterna Energía, O&#038;M Services</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-om-services/</link>
		
		<dc:creator><![CDATA[alterna]]></dc:creator>
		<pubDate>Thu, 07 Jul 2022 12:53:23 +0000</pubDate>
				<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-om-services/</guid>

					<description><![CDATA[<p>We have prepared this Alterna video to show you how our own cleaning vehicles operate. We have several vehicles to respond quickly to our clients&#8217; needs anywhere in Spain.</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-om-services/">Alterna Energía, O&amp;M Services</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>We have prepared this Alterna video to show you how our own cleaning vehicles operate.</p>
<p>We have several vehicles to respond quickly to our clients&#8217; needs anywhere in Spain.</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-om-services/">Alterna Energía, O&amp;M Services</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Alterna Energía will be responsible for the maintenance of three photovoltaic plants in Cáceres</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-will-be-responsible-for-the-maintenance-of-three-photovoltaic-plants-in-caceres/</link>
		
		<dc:creator><![CDATA[alterna]]></dc:creator>
		<pubDate>Thu, 05 May 2022 09:28:31 +0000</pubDate>
				<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-will-be-responsible-for-the-maintenance-of-three-photovoltaic-plants-in-caceres/</guid>

					<description><![CDATA[<p>May 5, 2022 Cáceres 2020, Cáceres 2021, and Cáceres 2023 are the three Alter Enersun facilities that total 137 MWp of power and supply more than 72,000 families. The plants represent a commitment to local development and environmental integration.</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-will-be-responsible-for-the-maintenance-of-three-photovoltaic-plants-in-caceres/">Alterna Energía will be responsible for the maintenance of three photovoltaic plants in Cáceres</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #f5b426;">May 5, 2022</span><br />
Cáceres 2020, Cáceres 2021, and Cáceres 2023 are the three Alter Enersun facilities that total 137 MWp of power and supply more than 72,000 families.<br />
The plants represent a commitment to local development and environmental integration.</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-will-be-responsible-for-the-maintenance-of-three-photovoltaic-plants-in-caceres/">Alterna Energía will be responsible for the maintenance of three photovoltaic plants in Cáceres</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Alterna Energía introduces an automated system to optimise the cleaning of photovoltaic installations.</title>
		<link>https://www.alternaenergia.com/en/news/alterna-energia-introduces-an-automated-system-to-optimise-the-cleaning-of-photovoltaic-installations/</link>
		
		<dc:creator><![CDATA[alterna]]></dc:creator>
		<pubDate>Tue, 26 Apr 2022 08:10:54 +0000</pubDate>
				<guid isPermaLink="false">https://www.alternaenergia.com/alterna-energia-introduces-an-automated-system-to-optimise-the-cleaning-of-photovoltaic-installations/</guid>

					<description><![CDATA[<p>April 26, 2022 This is a self-propelled, console-controlled system that can clean up to 400 kW/hour and represents a major step forward for the company, providing greater competitiveness and an expansion of its services. Alterna Energía’s Control Centre monitors the status of its photovoltaic plants worldwide and provides real-time information on their condition and activity.</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-introduces-an-automated-system-to-optimise-the-cleaning-of-photovoltaic-installations/">Alterna Energía introduces an automated system to optimise the cleaning of photovoltaic installations.</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p><span style="color: #f5b426;">April 26, 2022</span><br />
This is a self-propelled, console-controlled system that can clean up to 400 kW/hour and represents a major step forward for the company, providing greater competitiveness and an expansion of its services.<br />
Alterna Energía’s Control Centre monitors the status of its photovoltaic plants worldwide and provides real-time information on their condition and activity.</p>
<p>La entrada <a href="https://www.alternaenergia.com/en/news/alterna-energia-introduces-an-automated-system-to-optimise-the-cleaning-of-photovoltaic-installations/">Alterna Energía introduces an automated system to optimise the cleaning of photovoltaic installations.</a> se publicó primero en <a href="https://www.alternaenergia.com/en/">Alterna Energía</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
