First 2 MWh hybrid storage system

CÁCERES 2020

Integration of a 2 MWh BESS hybridized with a photovoltaic plant, aimed at improving energy management and the asset’s operational flexibility.

  • Total capacity: 2 MWh
  • Modular architecture
  • Estimated service life: up to 7,000 cycles
  • Hybridization of an asset in operation
  • Technical integration in a utility-scale environment
  • Innovation to maximize efficiency
  • Greater energy management capacity
  • Improved operational stability of the asset

Other projects

UNIVERSITY OF MURCIA

2.3 MWp managed on campus

More information
RCD ESPANYOL

Solar energy in operational stage

More information
CÁCERES 2021

Expansion to 4 MWh capacity

More information