Expansion to 4 MWh capacity

CÁCERES 2021

Expansion of the BESS system to 4 MWh to strengthen flexibility and optimize photovoltaic asset management.

  • Total capacity: 4 MWh
  • 2 independent modules
  • Up to 7,000 cycles
  • Utility asset scalability
  • Innovation to maximize efficiency
  • Technical integration in an operational Utility environment
  • Greater energy management margin
  • Increase in the system’s operational capacity

Other projects

JEREZ SOUTH AREA

2 MWp Canopy-Mounted

More information
RCD ESPANYOL

Solar energy in operational stage

More information
UNIVERSITY OF MURCIA

2.3 MWp managed on campus

More information