Self-consumption for High-Demand Industry

FRAGADÍS FRED

Photovoltaic installation executed under an EPC model for a company with high energy demand associated with industrial refrigeration. The objective was to reduce structural costs and improve the efficiency of the electricity supply.

  • 596.16 kWp installed
  • 1,728 panels
  • 862.8 MWh annual production
  • Year of execution: 2019
  • Integration into existing industrial roof
  • Optimization of continuous consumption profile
  • Adaptation to a new consumption pattern
  • Sustained reduction in energy costs
  • Improved operational efficiency
  • 172.6 tons of CO₂ avoided annually

Other projects

BESS – SCHNEIDER

Integrated batteries in industrial microgrids

More information
CÁCERES 2023

Comprehensive utility-scale photovoltaic asset management

More information
LA LUZ 260 MWp

261 MWp under O&M contract

More information