Hybrid PV + batteries for consumption optimization

COSTA RICA PROJECT

International EPC project combining photovoltaic generation and a storage system (BESS), designed to optimize self-consumption and improve the asset’s energy management.

  • 790.6 kWp PV power
  • 972 kWh storage
  • 1,500 MWh annual production
  • Estimated energy savings: 20%
  • Year of execution: 2022
  • Design adjusted to client’s consumption profile
  • International technical coordination
  • Integration of hybrid PV+BESS system
  • Reduction of demand peaks
  • Greater utilization of renewable generation
  • 300 tons of CO₂ avoided annually

Other projects

BESS – SCHNEIDER

Integrated batteries in industrial microgrids

More information
HUELVA 2020

50 MW under integrated management

More information
JEREZ SOUTH AREA

2 MWp Canopy-Mounted

More information