Integrated batteries in industrial microgrids

BESS – SCHNEIDER

Integration of a BESS system into the client’s industrial microgrid, aimed at maximizing renewable self-consumption, reducing peak demand, and improving energy efficiency.

  • 677.43 kWp of installed power
  • 1,158 modules
  • 216 kWh of stored energy
  • Integration in high-demand industrial environments
  • Configuration for peak shaving and load shifting
  • Integration without affecting client operations
  • Reduction of energy consumption during peak hours
  • Improved utilization of generated energy
  • Progress toward decarbonization goals