{"id":3818,"date":"2026-03-28T13:16:09","date_gmt":"2026-03-28T12:16:09","guid":{"rendered":"https:\/\/www.alternaenergia.com\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/"},"modified":"2026-03-28T13:16:09","modified_gmt":"2026-03-28T12:16:09","slug":"alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura","status":"publish","type":"post","link":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/","title":{"rendered":"Alterna Energ\u00eda boosts its energy storage division with 2 new BESS projects in Extremadura"},"content":{"rendered":"<div class=\"ctextoapartado triggerload\">\n<div class=\"cfixwords\">\n<div class=\"\">\n<p><strong>The projects total 35 MW of power and 70 MWh of capacity and will be carried out in Badajoz and C\u00e1ceres.<\/strong><\/p>\n<p><strong>The company leads the projects as a full-service integrator, covering the design, engineering, assembly, supply, installation, commissioning, and final testing of each system.<\/strong><\/p>\n<p><strong>October 9, 2025<\/strong>.- <strong>Alterna Energ\u00eda<\/strong>, a company specializing in the development and maintenance of solar installations and energy storage solutions, strengthens its energy storage division with the <strong>award of 2 new BESS (Battery Energy Storage Systems) projects<\/strong> in Extremadura, specifically in Badajoz and C\u00e1ceres.<\/p>\n<p>In total, the 2 battery storage projects will have an installed capacity of <strong>35 MW<\/strong> and a storage capacity of <strong>70 MWh<\/strong>, and their execution will be carried out progressively between 2025 and 2026, depending on the readiness of each site. The company will lead the project as a full-service integrator, covering the design, engineering, assembly, supply, installation, commissioning, and final testing of each system.<\/p>\n<p>The execution of these projects consolidates Alterna Energ\u00eda as one of the main EPC integrators in the BESS sector nationwide, expanding its territorial presence and its technological portfolio.<\/p>\n<p><strong>An in-house technical team and state-of-the-art technology<\/strong><\/p>\n<p>Alterna Energ\u00eda directly handles key project phases, such as engineering, partial assembly, and on-site technical supervision, thanks to its highly qualified in-house technical team. Furthermore, these new projects will incorporate state-of-the-art technology, including high-performance LFP batteries in outdoor containers, bidirectional PCS systems with <em>grid forming<\/em> and <em>blackstart<\/em> capabilities, EMS systems with AI-driven optimization, native integration with PPC, <em>trader<\/em> functionalities for operation in electricity markets, as well as auxiliary systems, MVS, and medium voltage protections.<\/p>\n<p>This is not the first project of its kind for the company, which already has two BESS plants in operation. This new award represents a significant expansion of its project portfolio, reinforcing its technological specialization and experience in the sector. Alterna Energ\u00eda thus consolidates its position as a strategic player in the deployment of BESS solutions and strengthens its territorial presence.<\/p>\n<p>The company&#8217;s approach is also distinguished by its ability to directly undertake Operation and Maintenance (O&amp;M) services, its approval as an official technical service by the battery manufacturer, and its technical solvency to execute complex projects with multiple technologies and high regulatory requirements.<\/p>\n<p><strong><em>About Alterna Energ\u00eda<\/em><\/strong><\/p>\n<p><em>Alterna Energ\u00eda is a company dedicated to developing comprehensive solutions for photovoltaic and self-consumption installations for businesses and institutions. With 19 years of experience in the sector, they position themselves as a trusted partner for companies to reduce their energy costs and environmental impact while making their investment profitable. The company has a control center at its facilities in Barcelona from which it monitors all its clients&#8217; installations, thus offering a first-class service. <\/em><\/p>\n<p><em>Alterna Energ\u00eda stands out for its commitment to the client and the quality of its services, offering a comprehensive service package, covering everything from engineering design to construction, commissioning, maintenance, and permit and legalization management. <\/em><\/p>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The projects total 35 MW of power and 70 MWh of capacity and will be carried out in Badajoz and C\u00e1ceres. The company leads the projects as a full-service integrator, covering the design, engineering, assembly, supply, installation, commissioning, and final testing of each system. October 9, 2025.- Alterna Energ\u00eda, a company specializing in the development<a class=\"more-link\" href=\"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/\">Continue reading <span class=\"screen-reader-text\">&#8220;Alterna Energ\u00eda boosts its energy storage division with 2 new BESS projects in Extremadura&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":3819,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3818","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>BESS Projects in Extremadura | Alterna Energ\u00eda<\/title>\n<meta name=\"description\" content=\"Alterna Energ\u00eda drives new BESS projects in Extremadura, strengthening energy storage and the integration of renewables.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"BESS Projects in Extremadura | Alterna Energ\u00eda\" \/>\n<meta property=\"og:description\" content=\"Alterna Energ\u00eda drives new BESS projects in Extremadura, strengthening energy storage and the integration of renewables.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/\" \/>\n<meta property=\"og:site_name\" content=\"Alterna Energ\u00eda\" \/>\n<meta property=\"article:published_time\" content=\"2026-03-28T12:16:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.alternaenergia.com\/wp-content\/uploads\/2026\/03\/autoconsumo-fotovoltaico-alterna-energia-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Comunicaci\u00f3 Integral Neorg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Comunicaci\u00f3 Integral Neorg\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/\"},\"author\":{\"name\":\"Comunicaci\u00f3 Integral Neorg\",\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/#\\\/schema\\\/person\\\/cc3be2448d860761a062c590760ad85b\"},\"headline\":\"Alterna Energ\u00eda boosts its energy storage division with 2 new BESS projects in Extremadura\",\"datePublished\":\"2026-03-28T12:16:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/\"},\"wordCount\":493,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.alternaenergia.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/autoconsumo-fotovoltaico-alterna-energia-1.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/\",\"url\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/\",\"name\":\"BESS Projects in Extremadura | Alterna Energ\u00eda\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.alternaenergia.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/autoconsumo-fotovoltaico-alterna-energia-1.jpg\",\"datePublished\":\"2026-03-28T12:16:09+00:00\",\"description\":\"Alterna Energ\u00eda drives new BESS projects in Extremadura, strengthening energy storage and the integration of renewables.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.alternaenergia.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/autoconsumo-fotovoltaico-alterna-energia-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.alternaenergia.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/autoconsumo-fotovoltaico-alterna-energia-1.jpg\",\"width\":800,\"height\":683,\"caption\":\"photovoltaic-self-consumption-alterna-energia\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/news\\\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/home\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Alterna Energ\u00eda boosts its energy storage division with 2 new BESS projects in Extremadura\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/\",\"name\":\"Alterna Energ\u00eda\",\"description\":\"Es un referente en el sector fotovoltaico por su experiencia en la construcci\u00f3n y mantenimiento de plantas fotovoltaicas.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/#organization\"},\"alternateName\":\"Alterna Energ\u00eda\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/#organization\",\"name\":\"Alterna Energ\u00eda\",\"alternateName\":\"Alterna Energ\u00eda\",\"url\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.alternaenergia.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Isotipo_Alterna_Color.svg\",\"contentUrl\":\"https:\\\/\\\/www.alternaenergia.com\\\/wp-content\\\/uploads\\\/2026\\\/02\\\/Isotipo_Alterna_Color.svg\",\"width\":188,\"height\":231,\"caption\":\"Alterna Energ\u00eda\"},\"image\":{\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UC8UmBnUKfKEJORsJorW9aUg\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/alterna-energia\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.alternaenergia.com\\\/en\\\/#\\\/schema\\\/person\\\/cc3be2448d860761a062c590760ad85b\",\"name\":\"Comunicaci\u00f3 Integral Neorg\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/709d3d8015183afa7401c02e2291a538cbfd4ffe62f4d86ce5f4871f22e86b09?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/709d3d8015183afa7401c02e2291a538cbfd4ffe62f4d86ce5f4871f22e86b09?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/709d3d8015183afa7401c02e2291a538cbfd4ffe62f4d86ce5f4871f22e86b09?s=96&d=mm&r=g\",\"caption\":\"Comunicaci\u00f3 Integral Neorg\"},\"sameAs\":[\"https:\\\/\\\/www.neorgsite.com\\\/\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"BESS Projects in Extremadura | Alterna Energ\u00eda","description":"Alterna Energ\u00eda drives new BESS projects in Extremadura, strengthening energy storage and the integration of renewables.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_US","og_type":"article","og_title":"BESS Projects in Extremadura | Alterna Energ\u00eda","og_description":"Alterna Energ\u00eda drives new BESS projects in Extremadura, strengthening energy storage and the integration of renewables.","og_url":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/","og_site_name":"Alterna Energ\u00eda","article_published_time":"2026-03-28T12:16:09+00:00","og_image":[{"width":800,"height":683,"url":"https:\/\/www.alternaenergia.com\/wp-content\/uploads\/2026\/03\/autoconsumo-fotovoltaico-alterna-energia-1.jpg","type":"image\/jpeg"}],"author":"Comunicaci\u00f3 Integral Neorg","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Comunicaci\u00f3 Integral Neorg","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/#article","isPartOf":{"@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/"},"author":{"name":"Comunicaci\u00f3 Integral Neorg","@id":"https:\/\/www.alternaenergia.com\/en\/#\/schema\/person\/cc3be2448d860761a062c590760ad85b"},"headline":"Alterna Energ\u00eda boosts its energy storage division with 2 new BESS projects in Extremadura","datePublished":"2026-03-28T12:16:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/"},"wordCount":493,"commentCount":0,"publisher":{"@id":"https:\/\/www.alternaenergia.com\/en\/#organization"},"image":{"@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/#primaryimage"},"thumbnailUrl":"https:\/\/www.alternaenergia.com\/wp-content\/uploads\/2026\/03\/autoconsumo-fotovoltaico-alterna-energia-1.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/","url":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/","name":"BESS Projects in Extremadura | Alterna Energ\u00eda","isPartOf":{"@id":"https:\/\/www.alternaenergia.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/#primaryimage"},"image":{"@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/#primaryimage"},"thumbnailUrl":"https:\/\/www.alternaenergia.com\/wp-content\/uploads\/2026\/03\/autoconsumo-fotovoltaico-alterna-energia-1.jpg","datePublished":"2026-03-28T12:16:09+00:00","description":"Alterna Energ\u00eda drives new BESS projects in Extremadura, strengthening energy storage and the integration of renewables.","breadcrumb":{"@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/#primaryimage","url":"https:\/\/www.alternaenergia.com\/wp-content\/uploads\/2026\/03\/autoconsumo-fotovoltaico-alterna-energia-1.jpg","contentUrl":"https:\/\/www.alternaenergia.com\/wp-content\/uploads\/2026\/03\/autoconsumo-fotovoltaico-alterna-energia-1.jpg","width":800,"height":683,"caption":"photovoltaic-self-consumption-alterna-energia"},{"@type":"BreadcrumbList","@id":"https:\/\/www.alternaenergia.com\/en\/news\/alterna-energia-boosts-its-energy-storage-division-with-2-new-bess-projects-in-extremadura\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.alternaenergia.com\/en\/home\/"},{"@type":"ListItem","position":2,"name":"Alterna Energ\u00eda boosts its energy storage division with 2 new BESS projects in Extremadura"}]},{"@type":"WebSite","@id":"https:\/\/www.alternaenergia.com\/en\/#website","url":"https:\/\/www.alternaenergia.com\/en\/","name":"Alterna Energ\u00eda","description":"Es un referente en el sector fotovoltaico por su experiencia en la construcci\u00f3n y mantenimiento de plantas fotovoltaicas.","publisher":{"@id":"https:\/\/www.alternaenergia.com\/en\/#organization"},"alternateName":"Alterna Energ\u00eda","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.alternaenergia.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.alternaenergia.com\/en\/#organization","name":"Alterna Energ\u00eda","alternateName":"Alterna Energ\u00eda","url":"https:\/\/www.alternaenergia.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.alternaenergia.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.alternaenergia.com\/wp-content\/uploads\/2026\/02\/Isotipo_Alterna_Color.svg","contentUrl":"https:\/\/www.alternaenergia.com\/wp-content\/uploads\/2026\/02\/Isotipo_Alterna_Color.svg","width":188,"height":231,"caption":"Alterna Energ\u00eda"},"image":{"@id":"https:\/\/www.alternaenergia.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.youtube.com\/channel\/UC8UmBnUKfKEJORsJorW9aUg","https:\/\/www.linkedin.com\/company\/alterna-energia\/"]},{"@type":"Person","@id":"https:\/\/www.alternaenergia.com\/en\/#\/schema\/person\/cc3be2448d860761a062c590760ad85b","name":"Comunicaci\u00f3 Integral Neorg","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/709d3d8015183afa7401c02e2291a538cbfd4ffe62f4d86ce5f4871f22e86b09?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/709d3d8015183afa7401c02e2291a538cbfd4ffe62f4d86ce5f4871f22e86b09?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/709d3d8015183afa7401c02e2291a538cbfd4ffe62f4d86ce5f4871f22e86b09?s=96&d=mm&r=g","caption":"Comunicaci\u00f3 Integral Neorg"},"sameAs":["https:\/\/www.neorgsite.com\/"]}]}},"_links":{"self":[{"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/posts\/3818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/comments?post=3818"}],"version-history":[{"count":0,"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/posts\/3818\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/media\/3819"}],"wp:attachment":[{"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/media?parent=3818"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/categories?post=3818"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.alternaenergia.com\/en\/wp-json\/wp\/v2\/tags?post=3818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}